Water powerplant MVE Hučák, Hradec Králové - monitoring of a small hydroelectric power plant

Reconstruction of the historic power plant first put into operation in 1912, with three Francis turbines, each with an output of 270kW.
Project:Water powerplant MVE Hučák, Hradec Králové - monitoring of a small hydroelectric power plant
Hardware:5x PLC Schneider Electric M580, Windows OS 10
Control stations:3xFrancisova turbína 3x 270kW, 4x HMI Schneider Electric
Implementation:INGOS, spol. s r.o., https://www.ingos.cz
Date of commission:2020

 The modernization carried out in 2018 - 2019 included the reconstruction of turbines, generators and the complete electrical part. INGOS, spol. s r.o. supplied a new 5kV cabinet substation, self-consumption transformer, static excitation of generators, control system for all three units and the power plant, including the SCADA system, electrical protection, low voltage distribution and cable distribution. The entire reconstruction was carried out with sensitivity to the original technology and the Art Nouveau power plant building itself, which is a protected cultural monument. The investor of the project was ČEZ Obnovitelné zdroje, spol. s r.o.