Central energy dispatching - Lenzing Biocel Paskov a.s.
Comprehensive energy dispatching system for the largest cellulose producer in Central Europe, built on Simatic and AMiT PLCs. The system collects data from 70 electricity meters and provides supervision via one main dispatching SCADA station and two client stations.
At Lenzing Biocel Paskov a.s., a system for monitoring and regulating electricity consumption is operated in the following configuration:
1 main station - server PC (in the main control room)
2 client stations - client PCs
Basic functions of the PC stations - energy dispatching:
- The application on the main PC (server) communicates with the Simatic S5 PLC station, monitors data from electricity meters (70 meters), monitors the agreed consumption diagram (15-minute and 1-hour consumption), and archives measured data (minute and 1-hour averages) into an MS SQL database.
- In December 2003, the system was expanded to include 7 measurements from a new plant - the sawmill. An AMiNi PLC from AMiT was chosen as the data concentrator for these measurements. The new plant also has a separate consumption diagram - monitoring consumption (deviations) and alarming on potential breaches (prediction).
- The application also performs basic economic calculations of electricity consumption, as well as balancing measured quantities at 15-minute, hourly, shift, daily, and monthly levels in the form of tables or historical trends, with the ability to edit individual data entries and highlight non-standard data in color.
- The application on the two client PCs enables identical dispatching functions as on the main PC. System access is protected by an operator password and permissions system. Communication between the main PC and client stations takes place over the corporate LAN network.
- The PC retrieves energy time from the Simatic S5 PLC (time synchronization once a day).
- Direct consumption control is not required (i.e., automatic shedding of appliances), but is carried out by operator intervention when the system alerts the operator by sounding a horn (the horn is activated on the Simatic S5 or on the main PC station).
Basic functions of the PLC concentrator:
- Data collection and maximum demand monitoring itself is ensured by the Siemens Simatic S5 controller, which is capable of operating fully autonomously without a connected PC and can store a backup of 15-minute consumption values for the last 24 hours in its internal memory. Local archives of measured values are stored in the Simatic memory in case of a temporary loss of communication with the master PC station. After restoring the communication link, data from the PLC is retroactively read into the PC station database.
- The program on the Simatic S5 counts pulses from main and secondary electricity meters and the gas meter at a 10-millisecond period; for main measurements, it calculates power from the time between pulses every 10 seconds and calculates predictions - issuing an alarm if there is a threat of exceeding the limit. Once a day, it synchronizes its real-time clock with a hardware 15-minute pulse. The application is prepared for both further expansion of the number of measured variables and expansion of the system to include the option of shedding selected appliances during periods when the 15-minute maximum is at risk of being exceeded.