REFERENCES
REFERENCES
In the list of selected references you can find applications
from various areas of the process automation
that were implemented by the PROMOTIC system.
We'll be glad to extend this list by Your interesting applications
that you've created by the PROMOTIC system.
You can send us the basic information by filling in this
form .
These information were provided by our customers in the different period of time.
We apologize for mistakes and inaccuracies that could result at intervals of time.
A list of detailed PROMOTIC application references
All countries Choice has no reference items Count of reference items in selection Select all
Selected references of the PROMOTIC system include the following applications:
Firm MICROSYS, spol. s r.o. , all external firms from 2004 year
All types: Of this types: Choice has no reference items
Barcode test
, Czech republic
Hardware: 1x PC (OS Windows) Control stations: RS232
Date of commission: 2010
Controling the test course of the flowmeters - Pražská teplárenská a.s.
, Czech republic
Hardware: 1x OS (PC, Windows XP Professional), SQL server
Control stations: 1x PLC
Simatic S7-317(TCP/IP), Softnet OPC server
Brief application description:
Controling application of the test course of flowmeters.
Controlling the technology, managing the measurement device catalogue in SQL database, computing the measured values,
archiving the data into SQL, procesing the measurement protocols.
Communication with the devices via the serial link.
Implementation: MPC System, společnost s r.o.
www.mpc.cz Date of commission: 2010
PROMOTIC - voice operated light control
, Czech republic
Hardware: 1x OS (PC, Windows XP Professional), OPC server, ODBC driver, MySQL
Control stations: 1x PCI6221, 1x CB-68LP, RAS - 0515, panel PT 009 + NIKOBUS
Brief application description: PROMOTIC - voice operated light control
Date of commission: 2010
Small hydropower plan in Nymburk
, Czech republic
Hardware: 1x PC Elvac Control stations: 2370kVA, 4x turbína kaplan, 1x francis, 6xPLC AC500
Date of commission: 2009
Small hydropower plan in Kníničky
, Czech republic
Hardware: 1x PC Elvac Control stations: 3600kVA, 1x turbína kaplan, PLC ABB, AC500
Date of commission: 2009
Energy consumption control system of Chart Ferox, a.s.
, Czech republic
Hardware: 1x PC WinXP
Control stations: AMiT (ADIS, ART 4000, APT 3100, AMINI, V/V, DM modules)
Date of commission: 2009
Control of mineral wool insulation plate production line, dome furnace , Belarus
Hardware: 3x PC (Win XP)
Control stations: 4x
Simatic S7-300
Date of commission: 2009
Complete control and visualization of experimental technological line
for fluoride reprocessing of the nuclear fuel
, Czech republic
Hardware: 1x PC (Win XP)
Control stations: 1x
SAIA PCD2
Date of commission: 2009
Visualization of experimental laboratory loops with molten
fluoride salts
, Czech republic
Hardware: 1x PC (Win XP)
Control stations: 1x
SAIA PCD3
Date of commission: 2009
REZA system vizualization in Hunagary
, Hungary
Hardware: 1x PC (Win) Control stations: REZA (modul EOV)
Date of commission: 2009
Malt processing control and monitoring - Sladovna Trnava
, Slovakia
Hardware: 1x PC (Win) Control stations: 2x B&R X20CP1485, 1x B&R 4XP00021, Pointek CLS 100PPS, ACOPOS inverter P84, PowerPanel PP45
Date of commission: 2009
ČOV Jirkov Waste water treatment plant,Czech republic
Hardware: 1x PC (Win XP),
Control stations: 7xPLC
Schneider Premio, Twido, OPC
Date of commission: 2008
ČOV Rakovník Waste water treatment plant - sediment systems, boiler plant and gas storage engine room , Czech republic
Hardware: 1x PC (Win XP),
Control stations: 2xPLC
SAIA PCD2, OPC server MERZ
Date of commission: 2008
Emission monitoring, Teplárna Přerov, Czech republic
Hardware: 1x PC (Win XP), MS SQL server
Control stations: 2x datalogger, TDC
Honeywell Implementation: MICROSYS, spol. s r.o., ECM ECO Monitoring, s.r.o.
Date of commission: 2009
Dispatching: Data vizualization and a power prediction model for new turbine - Actherm Chomutov, Czech republic
Hardware: 1x PC (Win 2003 Server), 10x webClient, MS SQL server
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2009
Biogas station - Ladzany, Hontianské Moravce, Hurbanovo , Slovakia
Hardware: 3x PC (Win XP),
Control stations: 3xPLC
Schneider M340 (Twido)
Date of commission: 2008
Biogas station - Třeboň , Czech republic
Hardware: 1x PC (Win XP),
Control stations: 1xPLC
Schneider M340 (Twido)
Date of commission: 2008
A complete control of the heating and water supply - Lázně Moravská Ostrava (SAREZA), Czech republic
Hardware: 1 x PC (Windows XP)
Control stations: 18x
AMiT (3x Amap99 + 3x APT130, Amiris99 + APT130, 11x ART4000, 2x APT3000, APT3100)
Date of commission: 2009
The measurement and regulation reconstruction - the central treatment station - Levické mliekárne a.s. Levice, Slovakia
Hardware: 1 x PC (Windows XP), OPC server
Control stations: VIPA SPEED7 300S (CPU313SC)
Date of commission: 2009
Computing the OEE, collecting the data from 15 stations - CTS Czech Republic, s.r.o., Czech republic
Date of commission: 2009
Monitoring the hybrid coal steam boiler - Klatovská teplárna ,
Czech republic
Hardware: 1x PC (Win XP),
Control stations: 1xPLC
Schneider Premium, OPC
Date of commission: 2009
Monitoring the chemical water treatment - Klatovská teplárna ,
Czech republic
Hardware: 1x PC (Win XP),
Control stations: 1xPLC
Schneider Unity, 2x Micra, 1x M340, OPC,
ADAM Date of commission: 2009
Dispatching: Paint shops and abrasive cleaning units - Medlánky, DPMB a.s, Czech republic
Hardware: 2x PC (Win XP),
Control stations: 2x
Teco Implementation: MICROSYS, spol. s r.o., ZAMAT spol. s r.o.
Date of commission: 2009
Emission monitoring powerplant boiler, Muridke, Pakistan
Hardware: 1x PC (Win XP),
Control stations: 2x
Simatic S7-300
Implementation: MICROSYS, spol. s r.o., RMT s.r.o
Date of commission: 2009
Dispatching: Monitoring and data management of the cartoning line - Biocel Paskov a.s.,
Czech republic
Hardware: 1x PC (Win 2003 Server), 20x webClient
Control stations: Simatic S7-300
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2009
EURO currency warehouse register system Národná banka Slovensko - Bratislava, Nové Zámky, Trenčín, Žilina, Lučenec, Poprad a Humenné, Slovakia
Hardware: 7x PC (Win XP),
Control stations: 5x
Mitsubishi Implementation: MICROSYS, spol. s r.o.
Date of commission: 2008
Dispatching: main heat exchange station - Medlánky, DPMB a.s, Czech republic
Hardware: 2x PC (Win XP),
Control stations: 2x
Teco Implementation: MICROSYS, spol. s r.o., ZAMAT spol. s r.o.
Date of commission: 2008
Emission monitoring gas-steam turbines, powerplant Bucurest, Romania
Hardware: 1x PC (Win XP),
Control stations: 1x datalogger
AMiT AMiNi 2D with I/O module
Implementation: MICROSYS, spol. s r.o., RMT s.r.o
Date of commission: 2008
An individual regulation of the room 164x - SOŠ Dopravní, Ostrava, Czech republic
Hardware: 1 x PC (Windows XP)
Control stations: AMiT (5x AMINI2D, AMINI)
Date of commission: 2008
Operational - energetic management for hotels, Hotel Alwyn, Czech republic
Hardware: 1x PC (Win XP),
Control stations: 24x RS2-B EXAKT, 2x
AMiT AMINI2D
Date of commission: 2008
Upgrade of the energetic dispatching in the SO33 area, Kovohutě Příbram nástupnická a.s., Czech republic
Hardware: 1x PC (Win XP), Control stations: EMS.4 1x -Digicontrol
Date of commission: 2008
Operational - energetic management for hotels, Vojenská lázeňská léčebna Balnoosanatorium Kijev, Ukraine
Hardware: 1x PC (Win 2000), Control stations: 21x RS2-B EXAKT
Date of commission: 2008
Operational - energetic management for hotels, Wellness Hotel a.s., Czech republic
Hardware: 2x PC (Win XP),
Control stations: 250x RS2-B EXAKT, 4x PCD 1.NT, ECS.3 6x -Digicontrol, 1x
AMiT AMINI2D
Date of commission: 2008
Energy Snina, a.s., Snina - The energetic utilization of biomass - the control of two fluid biomass boilers and two electric separators monitoring., Slovakia
Date of commission: 2008
Control of technological processes of the after-harvest lines, Vávrovice, Czech republic
Hardware: 1x PC (WinXP), Control stations: 1x Allex 110/80 I/O, RoutProF
Implementation: Zemědělské družstvo "Hraničář" se sídlem v Loděnici
www.zdhranicar.cz Date of commission: 2008
Regeneration-filtering mobile device for transformer oil, Ekofluid s.r.o. Santovka, Slovakia
Hardware: 1x PC (Win XP),
Control stations: 1x
Simatic S7-200
Date of commission: 2008
Ecological regeneration of transformer oil FLUIDEX R5000-RMB, SEPS a.s. Bratislava, Slovakia
Hardware: 1x PC (Win XP), Deltalogic S7 OPC server,
Control stations: 1x
Simatic S7-300
Date of commission: 2008
Ecological regeneration of transformer oil REOIL 4000S, LATVENERGO Riga - Lotyšsko, Republic of Latvia
Hardware: 1x Siemens OPC server,
Control stations: 1x
Simatic S7-200
Date of commission: 2008
Heat meters data collection, SAV Bratislava, Slovakia
Date of commission: 2008
Sever plus, Litvínov Monitoring of 5 terminal delivery stations (central heating system), trends, entering operational data, data storage, Czech republic
Hardware: 1x PC (Win XP),
Control stations: 5x PLC TWIDO -
Schneider-Electric , komunikace
Modbus radiomodem Conel CDA 70
Date of commission: 2008
Mlékárna Klatovy a.s. Monitoring and entering production prescriptions for 6 cheese curd makers. Production data atrchive., Czech republic
Hardware: 1x PC (Win XP),
Control stations: 6x PLC TSX 37 Micro -
Schneider-Electric , komunikace FIP
Date of commission: 2008
Dopravní podnik hl. m. Prahy, a.s. City public transport converter station - Prague Radlice, Czech republic
Hardware: 1x PC (Win XP), Control stations: 10x CT05, 1x CT02, 1x CU32
Date of commission: 2008
Dopravní podnik města Brna. a.s. City public transport converter station - Brno Spálená, Czech republic
Hardware: 1x PC (Win XP), Control stations: 8x CT05, 1x CT02, 1x CU32
Date of commission: 2008
Dopravní podnik města Brna. a.s. City public transport converter station - Brno Modřice, Czech republic
Hardware: 1x PC (Win XP), Control stations: 6x CT05, 1x CT02, 1x CU32
Date of commission: 2008
IFM Group, Brno Monitoring and control gas boiler plant, automated heating for offices and flats, garage monitoring and air conditioning., Czech republic
Hardware: 1x PC (Win XP),
Control stations: 2x PLC
AMiT , 1x AMAP99, 1x AMiRiS99 (RS232)
Date of commission: 2008
ČOV Kravaře Waste water treatment plant, Czech republic
Hardware: 1x PC (Win XP),
Control stations: PLC
AMiT , 1x MEST110 (RS232)
Date of commission: 2008
FOSFA a.s. Dosage control system for chemical mixtures used in food-processing., Czech republic
Date of commission: 2008
P-D Refractories CZ a.s. Material control and weighting system for chimney insert manufacturing., Czech republic
Hardware: 1x PC (Win XP),
Control stations: PLC
Simatic S7-300
Date of commission: 2008
STOMIX, s.r.o. Production control system of ready-mixed plasters. Interconnected with Navision information system., Czech republic
Date of commission: 2008
Emission monitoring 2 powerplant boilers, Pakistan
Hardware: 1x PC (Win XP),
Control stations: 1x
Simatic S7-300
Implementation: MICROSYS, spol. s r.o., RMT s.r.o
Date of commission: 2008
Remote temperature reading and thermal nodes monitoring and control system - Zakład Energetyki Cieplnej w Starachowicach Sp. z o.o.
, Poland
Hardware: 1x PC (WinXP), Control stations: Kamstrup: Multical I,II,III, 66C, Compact, Apator
LQM, Aquatherm Supercal: 430, 431, 432; Landis&Gyr WSD, Danfoss EEM-C; Praterm Z-Elektronik, Siemens RVD-240/230, Danfoss ECL
200/300; Landis RVP-97
Date of commission: 2007
Control and monitoring of coal feeding- Plzeňská energetika a.s.
, Czech republic
Hardware: 2x OS (PC DELL Precision 390, Windows XP Professional, 2x monitor)
Control stations: 3x PLC
Simatic S7-317(TCP/IP), 4 x I/O Turck (Profibus), Softnet OPC server
Brief application description:
Controlling and monitoring the coal feeding of the boilers.
Complete control and monitoring of the conveyor belts, checking the coal levels in storage.
The login system is based on access cards.
The communication between the PC and PLC is done via Ethernet TCP/IP by the Softnet OPC server.
Implementation: MPC System, společnost s r.o.
www.mpc.cz Date of commission: 2007
Control and monitoring of coal feeding - Teplárna Tábor a.s.
, Czech republic
Hardware: 1x OS (Panel PC Advantech,Windows XP Professional)
Control stations: 1x PLC
GE-Fanuc (Ethernet TCP/IP), GE OPC server.
Brief application description:
Control and monitoring of coal-feeding lines for boilers.
Complete control and monitoring of line status, supervising the coal levels in containers.
Implementation: MPC System, společnost s r.o.
www.mpc.cz Date of commission: 2007
Monitoring and control system of experimental gasifying device (SK)
, Slovakia
Hardware: 1x OS Windows XP Professional),
Bernecker&Reiner PVI OPC Control stations: PLC
Bernecker&Reiner
1x X20CP1485, 3x X20DO9322, 1x X20DI9371, 4x X20AI4622, 4x X20AO4622, 11x X20AT6402
Date of commission: 2007
Dopravní podnik města Brna. a.s. City public transport converter station - Brno Šlapanice, Czech republic
Hardware: 1x PC (Win XP), Control stations: 9x CT05, 1x CT02, 1x CU32
Date of commission: 2007
Electric power consumption monitoring system - DURA Kopřivnice, Czech republic
Hardware: 1x PC (Win XP),
Control stations: 1x
Simatic S7-300
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2007
Water consumption measurement based on indirect load method - ČEZ, a.s. - Elektrárna Mělník, Czech republic
Hardware: 1x PC, Control stations: 10x elektroměry ENERMET
Date of commission: 2007
Intranet production info server - water, heat, electricity - ZSNP, a.s. Závod Energetik, Slovakia
Hardware: 1x PC (Win XP),
Implementation: ZSNP, a.s.
Date of commission: 2007
Coaling - Hexion Specialty Chemicals, a.s., Czech republic
Hardware: 1x PC (Win XP),
Control stations: OPC Schneider Electric OFS3.31,
Schneider-Electric Quantum
Date of commission: 2007
Monitoring, TC Mach heat pump, complex smart house management - p.Rumla Prague 6, Czech republic
Hardware: 1x PC,
Control stations: 1x
SAIA Date of commission: 2007
Monitoring and archiving of operational data in a foundry - Alulit Benešov, Metaz, a.s Týnec n. Sázavou, Czech republic
Hardware: 2x PC,
Control stations: 4x (Benešov) + 6x (Týnec)
Mitsubishi , GSM modem
Date of commission: 2007
VOC disposal, IACG s.r.o., Czech republic
Hardware: 1x PC (Win 2000),
Control stations: 1x
AMiT ADIS
Date of commission: 2007
Oxidation catalytic unit, Spolchemie a.s., Czech republic
Hardware: 1x PC (Win XP),
Control stations: AMiT AMAP99
Date of commission: 2007
Operational - energetic management for hotels, Hotel Ludmila, Czech republic
Hardware: 1x PC (Win 2003 Server), Control stations: 30x RS2-B EXAKT
Date of commission: 2007
Operational - energetic management for hotels, Vojenská lázeńská léčebna Teplice, Czech republic
Hardware: 1x PC (Win XP), Control stations: 12x RS2-B EXAKT
Date of commission: 2007
Operational - energetic management for hotels, Hotel Chvalská Tvrz, Czech republic
Hardware: 1x PC (Win XP),
Control stations: 26x RS2-B EXAKT, 26x Basicom, 2x
AMiT AMINI2D
Date of commission: 2007
Mineral water sources data mining and monitoring system - Kúpele Bardejov
, Slovakia
Hardware: 1x PC,
Control stations: 1x
Mitsubishi Alfa, GSM
Date of commission: 2007
Mineral water sources data mining and monitoring system - Kúpele Lúčky
, Slovakia
Hardware: 1x PC, Control stations: A/D a DI modules ICP DAS
Date of commission: 2007
Kolín power station terminal - boiler and turbine production control system, Elektrárna Kolín, a.s., Czech republic
Hardware: 1x PC, Control stations: 4x ZAT, Schneider Automation, ABB
Date of commission: 2007
Emission monitoring in 6 objects - Arcelor Mittal a.s. Ostrava, Czech republic
Hardware: 1x PC (Win), Control stations: 9x datalogger
Implementation: MICROSYS, spol. s r.o., ECM ECO Monitoring, s.r.o.
Date of commission: 2007
Dispatching center heat pump plants - Moravský Krumlov,
Czech republic
Hardware: 1x PC (Win 2003 Server),
Control stations: 10x
AMiT Implementation: MICROSYS, spol. s r.o., TC Mach
Date of commission: 2007
Dispatching center of heat sources - SDC Ostrava, České dráhy a.s., Czech republic
Hardware: 2x PC (Win XP),
Control stations: 6x PLC
Teco , 2x
AMiT Implementation: MICROSYS, spol. s r.o.
Date of commission: 2007
Dispatching center energetic management and swimming pool technologies control - Slovenské liečebné kúpele Turčianske Teplice, Slovakia
Date of commission: 2007
Monitoring of air conditioning and heating system of a building ČNB Ústí n. Labem, Czech republic
Hardware: 1x PC,
Control stations: 3x
SAIA PCD3, GSM modem, dálková správa
Date of commission: 2007
Expanding the electroenergetics dispatching by cogeneration - OKK OKD a.s., Czech republic
Hardware: 2x PC (Win XP),
Control stations: 5x
AMiT AMiNi
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2007
Dispatching center of the heating plant management of the Husovice depot - DPMB a.s., Czech republic
Hardware: 2x PC (Win XP),
Control stations: 2x
Teco Implementation: MICROSYS, spol. s r.o.
Date of commission: 2007
Monitoring and regulation heating of the central office building - DPMB a.s., Czech republic
Hardware: 2x PC (Win XP),
Control stations: 1x
Teco , ETA hlavice
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2007
Control of stock control
- Olpran Olomouc, Czech republic
Hardware: 2x PC (Win XP),
Control stations: 1x
Mitsubishi Implementation: MICROSYS, spol. s r.o., Ing.Miroslav Horák-HOZST
Date of commission: 2006 - 2007
Register system of medium of exchange, Slovakia National Bank, branch Poprad, Humenné, Slovakia
Hardware: 2x PC (Win XP), Control stations: 2x RMC
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2006
Monitoring and visualisation, hose diameter evaluation, Goodyear Ostrava s.r.o., Czech republic
Hardware: 2x PC (Win XP),
Control stations: 2x
AMiT Amini
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2006
Gas stokehold, Dispatching and control system - Bohumín, České dráhy a.s., Czech republic
Hardware: 1x PC (Win XP),
Control stations: 1x
Teco 203
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2006
Promotic central control system in Povážské Bystrica
, Slovakia
Hardware: 1x PC (WinXP),
Control stations: Mitsubishi Date of commission: 2006
Monitoring and visualisation: Drier and furnace operation - Wieneberger Týn nad Vltavou, Czech republic
Hardware: 2x PC (Win XP),
Control stations: 2x
Simatic S5
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2006
Dispatching, 37 heat exchanger stations - Ostrava - Zábřeh, Dalkia a.s., Czech republic
Hardware: 1x PC (Win XP), Control stations: 37x PLC Saphir
Implementation: MICROSYS, spol. s r.o. + AM technik s.r.o.
Date of commission: 2006
Emission monitoring - Biocel Paskov, Czech republic
Hardware: 1x PC (Win XP), Control stations: 3x datalogger
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring, s.r.o.
Date of commission: 1996, 2006
Monitoring and visualisation: Heating plant operation data - Actherm Chomutov, Czech republic
Hardware: 1x PC (Win 2003 Server) + 10 client PC, MS SQL server
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2006
Operational - energetic management for hotels, Vojenská lázeňská zotavovna Malý Šišák, Czech republic
Hardware: 1x PC (Win XP),
Control stations: 2x
AMiT AMINI E
Date of commission: 2006
Operational - energetic management for hotels, Grandhotel Zlatý lev a.s., Czech republic
Hardware: 1x PC (Win XP), Control stations: 136x RS2-B EXAKT
Date of commission: 2006
Heat meters, water meters, gas meters and electricity meters data collection, Dalkia a.s. Poprad, Slovakia
Hardware: 1x PC (Win 98), Control stations: 5x Calmex, 2x vodoměr, 1x elektroměr, 1x plynoměr ECS
Date of commission: 2006
Dopravní podnik hl. m. Prahy, a.s. City public transport converter station - Prague Holešovice, Czech republic
Hardware: 1x PC (Win XP), Control stations: 13x CT05, 1x CT02, 1x CU32
Date of commission: 2006
Dopravní podnik hl. m. Prahy, a.s. City public transport converter station - Prague Ohrada, Czech republic
Hardware: 1x PC (Win 2000), Control stations: 12x CT05, 1x CT02
Date of commission: 2006
Clear river Bečva: Monitoring and visualisation - Dispatching, Waste water treatment plant Valašské Meziřičí, Czech republic
Hardware: 3x PC (WinXP),
Control stations: 36x
Allen-Bradley SLC500,
Server RSLinx, OPC
Date of commission: 2006
Clear river Bečva: Monitoring and visualisation - Dispatching, Waste water treatment plant Zubří, Czech republic
Hardware: 3x PC (WinXP),
Control stations: 8x
Allen-Bradley SLC500,
Server RSLinx, OPC
Date of commission: 2006
Clear river Bečva: Monitoring and visualisation - Dispatching, Waste water treatment plant Vsetín, Czech republic
Hardware: 3x PC (WinXP),
Control stations: 8x
Allen-Bradley CompactLogix
Date of commission: 2006
Monitoring and visualisation: Enterprise data - Model Obaly a.s., Bilgoraj, Poland
Hardware: 5x PC OS Windows, MS SQL
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2006
Monitoring and visualisation: Enterprise data - Model Obaly a.s., Nymburk, Czech republic
Hardware: 7x PC OS Windows, MS SQL
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2006
Emission monitoring for mobile measurement car - ČIŽP Prague, Czech republic
Hardware: 1x PC (Win XP), Control stations: 1x datalogger
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring, s.r.o.
Date of commission: 2006
Control system: 2x TARPO press - Autopal Nový Jičín, Czech republic
Hardware: -,
Control stations: 2x
Simatic C7-613
Implementation: MICROSYS, spol. s r.o. + Tarpo s.r.o.
Date of commission: 2006
Reduction and heat exchange station operating control centre - Ostrava - Fifejdy, Dalkia a.s., Czech republic
Hardware: 1x PC (Win XP),
Control stations: 1x
Simatic Implementation: MICROSYS, spol. s r.o. + Siemens Ostrava, s.r.o.
Date of commission: 2006
Cetral exchange station - Hexion Specialty Chemicals, a.s., Czech republic
Implementation: ZPA-RP, a.s.
Date of commission: 2006
Power dispatching, measuring of the green energy - Biocel Paskov a.s., Czech republic
Hardware: 1x PC (Win XP),
Control stations: 1x
AMiT Amini
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2006
Dispatching: Central car wash room - Medlánky, DPMB a.s., Czech republic
Hardware: 1x PC (Win XP),
Control stations: 3x
Teco Implementation: MICROSYS, spol. s r.o.
Date of commission: 2006
Measuring of the energy consumption - Teplice, United Energy, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 12x
MULTICAL Date of commission: 2006
Evaluation SW for test pump line, Výrobna kyslíka v závode Trnava, Slovakia
Hardware: 1x PC (WinXP),
Control stations: Mitsubishi FX
Date of commission: 2006
Register system of medium of exchange, Slovakia National Bank Bratislava, branch Nové Zámky, Trenčín, Žilina, Lučenec, Slovakia
Hardware: 5x PC (Win XP),
Control stations: 5x
Mitsubishi Implementation: MICROSYS, spol. s r.o.
Date of commission: 2005
Water processing plant monitoring - ZSNP, a.s. Závod Energetik, Slovakia
Hardware: 1x PC (Win XP), Control stations: 4x Eko200, Dix
Implementation: ZSNP, a.s.
Date of commission: 2005
SMS GSM signal system co-oparating with AirLiquide system, Trnava, Slovakia
Hardware: 1x PC (WinXP),
Control stations: Modicon , GSM modul TC35 Siemens
Date of commission: 2005
Monitoring and control: heating for buildings - COOP Jednota Prievidza (40x), COOP Jednota Krupina (1x), Slovakia
Hardware: 2x PC (WinXP), Control stations: SOFTERM, OMOS, SOFTCONTROL
Date of commission: 2005
Monitoring and control: heating for buildings - Prešov, obvod Sekčov (7x), Slovakia
Hardware: 1x PC (WinME),
Control stations: SOFTCONTROL, MAXTRONIC,
MULTICAL Date of commission: 2005
Monitoring and control: heating exchange station heating system - OST - 118 Košice, Slovakia
Hardware: 1x PC (WinME), Control stations: SOFTCONTROL
Date of commission: 2005
Wood kiln, Monitoring and control, Hungary
Hardware: 1x PC (WinME), Control stations: REGULA KS
Date of commission: 2005
Monitoring of distribution point (database, events, failures) - CVS Těchonín, Eurotel ECM Prague, Mafra Prague, Czech republic
Hardware: 1x PC,
Control stations: Scheider TSX Premium,
Modbus , 2x Rotační UPS Caterpillar
Implementation: Atria s.r.o.
Date of commission: 2005
Swimming pool (database, events, failures) - Škoda M. Boleslav, Czech republic
Hardware: 1x PC,
Control stations: SAIA PCD2.M150,
Modbus Implementation: Atria s.r.o.
Date of commission: 2005
Bulding monitoring in ministry of Defence (database, events, failures, 1/4h max) - St. Boleslav, Czech republic
Hardware: 1x PC,
Control stations: Scheider TSX Premium,
Modbus Implementation: Atria s.r.o.
Date of commission: 2005
Test automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2005
Tube test KI, KII and KII station - WAVIN Ekoplastik s.r.o., Kostelec nad Labem, Czech republic
Hardware: 3x PC (WinXP)
Control stations: 3x
Modicon TSX 3721
Date of commission: 2005
Dispatching: Biomass stokehold - Kašperské Hory, Czech republic
Hardware: 1x PC (Win XP), Control stations: 2x PLC Schmidt
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2005
Exchanger and stokehold control - Důl 9.květen - Karviná, Czech republic
Hardware: 1x PC (WinXP)
Control stations: 1x
SAIA Date of commission: 2005
Test automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2005
Monitoring and visualisation: The wine production - Livi Dubňany, Czech republic
Hardware: 1x PC (Win XP),
Control stations: 1x
AMiT Implementation: MICROSYS, spol. s r.o.
Date of commission: 2005
Test automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2005
Operational data record - press, CPForge a.s., Czech republic
Implementation: Ing.František ŽÁK
Date of commission: 2005
Waste water treatment plant, Energy consumption report nad K2,K3,K4 boiler monitoring - United Energy a.s. divize Teplo, Mimon, Czech republic
Hardware: 1x PC (WinXP), Control stations: 2x WAGO
Date of commission: 2005
Technology monitoring, operational data record - hop processing line, Chmelařství družstvo Žatec, Czech republic
Implementation: Ing.František ŽÁK
Date of commission: 2005
Peroxides production - Conlac spol. s r.o., Czech republic
Hardware: 1x PC (WinXP), OPC
Control stations: Simatic S7-300, OPC
Implementation: ZPA-RP, a.s.
Date of commission: 2005
Control system: 3x TARPO press - Autopal Nový Jičín, Czech republic
Hardware: ,
Control stations: 3x
Simatic C7-613
Implementation: MICROSYS, spol. s r.o. + Tarpo s.r.o.
Date of commission: 2005
Measurement and regulation of electricity and gass - Wienerberger Jezernice, Czech republic
Hardware: 1x PC (Win XP),
Control stations: 1x
AMiT Amini, Elcor94
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2005
Exchanger control - Vítkovice a.s. Stamont, Czech republic
Hardware: 1x PC (WinXPP)
Control stations: 8x
AMiT Date of commission: 2005
Measurement and evaluation of the water and gass consumption - DURA Kopřivnice, Czech republic
Hardware: 1x PC (Win XP),
Control stations: 1x
AMiT Amini, Elcor94
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2005
Emission monitoring - Koksovna Svoboda, Ostrava, Czech republic
Hardware: 1x PC, Control stations: 3x datalogger
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring, s.r.o.
Date of commission: 1996, 2005
Boiler K13 50t/h - RSM Chemacryl, a.s. Sokolov, Czech republic
Implementation: ZPA-RP, a.s.
Date of commission: 2005
Test automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2005
Boiler K14 50t/h - RSM Chemacryl, a.s. Sokolov, Czech republic
Implementation: ZPA-RP, a.s.
Date of commission: 2005
Control of: transportation and storage of barleycorn and malt - Sladovny Soufflet ČR a.s., provoz Kroměříž, Czech republic
Hardware: 3x PC (Win2000) + OPC
Control stations: 2x
Simatic S5-135U, 33x Krohne
Date of commission: 2005
Emission monitoring - Spalovna FN Hradec Králové, Czech republic
Hardware: 1x PC, Control stations: 1x datalogger
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring, s.r.o.
Date of commission: 2005
Emission monitoring - Koksovna Šverma, Ostrava, Czech republic
Hardware: 1x PC, Control stations: 2x datalogger
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring, s.r.o.
Date of commission: 2005
Exchangers control and town heating, communication by RACOM radio - DALKIA ČR a.s. Frýdek Místek, Czech republic
Hardware: 1x PC (WinXP), SQL
Control stations: 10x
AMiT , RACOM
Date of commission: 2005
Water chemistry processing plant + Drinking water production - Plzeňská teplárenská a.s., Czech republic
Hardware: 2x PC (WinXP),
Control stations: 17x
Schneider-Electric TSX Premium a TSX Micro, Nano, Momentum
Date of commission: 1998 - 2005
Control of: heating and air conditioning of facilities - Aliachem a.s., o.z. Fatra Napajedla, provoz Chropyně, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 8x
Landis&Gyr - Unigyr RWP80
Date of commission: 2005
Monitoring - Acterm s.r.o. Chomutov, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 70x podstanic RSZ, iRSM,
AMiT Date of commission: 2005
Head supplement in Kopisty area - Mostecká uhelná a.s., Czech republic
Hardware: 1x PC (WinXP),
Control stations:
1x
Simatic S7 300,
11x
Simatic S7 200
Date of commission: 2005
Upgrade of the MaR system in VS Doly Bilina - Severočeské doly, a.s. Doly Bílina, Czech republic
Hardware: 1x PC (WinXP),
Control stations:
1x
Simatic S7 300,
2x
Simatic S7 200
Date of commission: 2005
Polyester synthetic resin - Spolek pro chemickou a hutní výrobu, a.s., Czech republic
Hardware: 1x PC (WinXP), Control stations: ACS
Date of commission: 2005
Update of dispatcher SW - MUS Uniservis s.r.o., Czech republic
Hardware: 2x PC (WinXP),
Control stations:
5x RSZ -
Sauter , iRSM - Martia a.s.
Date of commission: 2005
Monitoring and visualisation: Business data in SQL database - Model Obaly a.s, Czech republic
Hardware: 10xPC OS Citrix, 5x PC OS Windows, MS SQL
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2005
Waste water treatment plant, interest municipality association Nýřany, Tlučná, Vejprnice, Czech republic
Hardware: 1x PC (WinXP),
Control stations: Modicon TSX Micro
Date of commission: 2005
Emission monitoringfor mobile measuring - Třinecké železárny a.s., Czech republic
Hardware: 1x PC, Control stations: 1x datalogger
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2000, 2005
Natatorium heat and mud bath preparation - Lázně Velichovky, Czech republic
Hardware: 1x PC (WinXP)
Control stations: 2x
AMiT Date of commission: 2005
Technical gas filling - SIAD Rajhradice u Brna, Czech republic
Hardware: 1x PC (WinXP)
Control stations: 1x
Simatic Date of commission: 2005
Dopravní podnik města Brna a.s. City public transport converter station - Brno Osová, Czech republic
Hardware: 1x PC (Win 2000), Control stations: 8x CT05, 1x CT02, 1x CU32
Date of commission: 2004
Dopravní podnik města Olomouce a.s. City public transport converter station - Olomouc Neředín, Czech republic
Hardware: 1x PC (Win 2000), Control stations: 6x CT05, 1x CU32
Date of commission: 2004
Dispatching center of heat supplier, KMET a.s. Handlova, Slovakia
Hardware: 2x PC (WinXP),
Control stations:
126x
SAIA , ADOS,
AMiT Amiris
Date of commission: 2004
Monitoring system of mineral water sources, TMV a.s. Trenčín, plniareň minerálnych vôd Tr.Mitice, Slovakia
Hardware: 2x PC (WinXP), Control stations: 8x ICP CON, ComerGon
Date of commission: 2004
Thermal meters data collection and monitoring, ZSNP, a.s. Závod Energetik, Slovakia
Implementation: ZSNP, a.s.
Date of commission: 2002 - 2004
Waterworks automation - RSM Chemacryl, a.s. Sokolov, Czech republic
Implementation: ZPA-RP, a.s.
Date of commission: 2004
Bearing refrigeration by hydrogen - Nuclear power station MOCHOVCE, Slovakia
Hardware: 1x PC (WinXP)
Control stations: 1x
Simatic Date of commission: 2004
Control system: Generator TG2 6MW - RSM Chemacryl, a.s. Sokolov, Czech republic
Implementation: ZPA-RP, a.s.
Date of commission: 2004
Waste water treatment plant, Písek, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 3x
Modicon Premium, Micro
Date of commission: 2004
Exchange stations, Monitoring and control, Litoměřice, United Energy, Czech republic
Date of commission: 2004
Exchange stations, Monitoring and control, Jirkov, United Energy Chomutov, Czech republic
Hardware: 1x PC (WinXP), Control stations: 8x SEA MPS
Date of commission: 2004
Emission monitoring, incinerator, County hospital Liberec, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
AMiT Amini E
Implementation: MICROSYS, spol. s r.o. + RTM
Date of commission: 2004
Emission monitoring, incinerator, Megawaste-Ekoterm, Prostějov, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
AMiT Amini E
Implementation: MICROSYS, spol. s r.o. + RTM
Date of commission: 2004
TEZ Control system extension with GEKO regulation, Slatina, DPMB a.s., Brno
, Czech republic
Hardware: ,
Control stations: Teco TECOreg
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2004
Energy monitoring extension by 2 saw measuring, Biocel Paskov a.s.
, Czech republic
Hardware: 3x PC (WinXP),
Control stations: AMiT Amini
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2004
Dispatching center of the heating plant Zatec, Žatecká teplárenská a.s., Czech republic
Hardware: 1x PC (WinXP), 9x COM (MOXA),
Control stations:
135x
Satchwell (IAC 400, 600),
12x
Landis&Gyr PRV 2
Date of commission: 2004
Dispatching center of the heating plant Litomerice, United Energy a.s., Czech republic
Hardware: 1x PC (WinXP), 7x COM (MOXA),
Control stations: 30x
Satchwell (IAC 400, 600)
Date of commission: 2004
Heating plant terminal, Dalkia ČR,a.s., heating plant Olomouc, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
Simatic S5
Date of commission: 2004
Control of: Liquid substratum bottler - Aliachem a.s., o.z. Fatra, Napajedla, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
SAIA Date of commission: 2004
Fabrication automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2004
Waterwork dispatching, trensmission in GSM network, Domažlicko, Czech republic
Hardware: 2x PC (WinXP),
Control stations: 12x
SAIA PCD2,
Mitsubishi FX1N, FX2N
Implementation: Atria s.r.o.
Date of commission: 2004
Emission monitoring LUKOIL, Korobkovsky, Russia
Hardware: 3x PC (WinXP),
Control stations: 20x
Teco Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring
Date of commission: 2004
Monitoring by technological variables Leadpress and 2 Boilers, Semperflex Optimit Odry
, Czech republic
Hardware: 5x PC (WinXP),
Control stations: 3x
AMiT Amini E/1M
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2004
Dispatching center of the heating plant, Mimoň Ralsko, United Energy a.s., Czech republic
Hardware: 1x PC (WinXP), GSM modemy CONEL,
Control stations: 1x
Schneider-Electric TWIDO, MOMENTUM
Date of commission: 2004
Heating plant terminal Usti nad Labem, Teplárny Ústí nad Labem, a.s., Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
Honeywell HPM
Date of commission: 2004
Monitoring of selected machines - Brano a.s., člen Brano Group, SBU CS Rakovník, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
ADAM 4053
Date of commission: 2004
Waste water treatment plant: Poděbradka a.s., Poděbrady, Czech republic
Hardware: 1x PC (WinXP) + SQL server,
Control stations: 1x
Simatic S7-300
Date of commission: 2004
Monitoring of dangerous substance leakage - Spolek pro chemickou a hutní výrobu a.s., Ústí nad Labem, Czech republic
Hardware: 1x PC (WinXP) + SQL server,
Control stations: 4x
Simatic S7-300
Date of commission: 2004
Test automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 2x PC,
Control stations: Moeller XC201
Implementation: Ing.František ŽÁK
Date of commission: 2004
Water power station - ZČE,a.s. Černé Jezero, 2,7MW Hracholusky, Czech republic
Hardware: 3x PC (Win2000),
Control stations: 2x
Simatic S7-300
Date of commission: 2004
Control of: PVC bench - Aliachem a.s., o.z. Fatra, Chropyně, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
Modicon Premium, Advantys
Date of commission: 2004
Heat management resurgence ČD Ostrava, Dalkia a.s., Czech republic
Hardware: 3x PC (WinXP),
Control stations: 20x
Teco Implementation: MICROSYS, spol. s r.o. + SEMO
Date of commission: 2004
Automated parking system - Melantrich Prague, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
Simatic S7-400
Date of commission: 2004
Transfer on UUK Most - mix junction - Mostecká uhelná společnost a.s., Czech republic
Hardware: 1x PC (WinXP) + SQL server,
Control stations:
27x RSZ, RSK -
Sauter , iRSM - Martia a.s.
Date of commission: 2004
ELUIII - Exchange station 800t/h, 70MW, 160 st.C - Plzeňská energetika a.s., Czech republic
Hardware: 3x PC (WinXP),
Control stations: Simatic S7-400
Date of commission: 2004
Emission monitoring, heating plant Tábor, Czech republic
Hardware: 1x PC (WinXP), Control stations: 1x Datalogger DL8816
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring
Date of commission: 2004
Exchanger control in HBZS Most - Mostecká uhelná společnost a.s., Czech republic
Hardware: 2x PC (WinXP) + SQL server,
Control stations: 1x RSK -
Sauter Date of commission: 2004
Fabrication automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2004
Excavator station - Plzeňská teplárenská a.s., Czech republic
Date of commission: 2004
Cover-hall of bituminous compositions, Prague, SKANSKA a.s., Czech republic
Date of commission: 2004
Automated parking system - Česká spořitelna Prague, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
Simatic S7-400
Date of commission: 2004
technology control - winter stadium Ústí nad Labem, Czech republic
Hardware: 2x PC (WinXP),
Control stations: 3x
Simatic S7-300
Date of commission: 2004
Konverze PVS 10, Litvínov - United Energy Litvínov, Czech republic
Hardware: 2x PC (WinXP) + SQL server,
Control stations: 9x
Modicon , iRSM - Martia a.s.
Date of commission: 2004
Control and monitoring system: Water power station Liptovská Mara (3000x I/O) - SE a.s. Vodné elektrárne, factory Trenčín, Slovakia
Hardware: 3x PC (WinXP)
Date of commission: 2004
Waste water treatment plant: Monitoring and visualisation - operation, faulty states Břeclav, VaK Břeclav, a.s., Czech republic
Hardware: 1x PC (WinXP),
Control stations: Allen-Bradley (4x SLC5/03, 1x ML1500)
Date of commission: 2004
Fabrication automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2004
Extension of monitoring by 5 clients PC's, Semperflex Optimit Odry
, Czech republic
Hardware: 5x PC (WinXP)
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2004
Emission monitoring, incinerator, Valašské Meziříčí, Deza a.s.
, Czech republic
Hardware: 1x PC (WinXP),
Control stations: Datalogger, 1x
AMiT Amini + 1x DINAI24
Implementation: MICROSYS, spol. s r.o., PRODEZ, a.s., ECM ECO Monitoring
Date of commission: 2002, 2003, 2004
2 stations extension and visualisation by WEB on subscribers intranet, V.I.Trade s.r.o. Nitra, Slovakia
Hardware: 1x PC (WinXP),
Control stations: 2x FX1N
Mitsubishi Date of commission: 2004
Data capture system in Czech Republic power system, ČEPS, a.s., Ústřední dispečink Prague, Czech republic
Hardware: 1x PC (WinXP), Control stations: 8x TG809
Date of commission: 2004
Distribution point monitoring - Power dispatching Eurotel, Czech republic
Implementation: Atria s.r.o.
Date of commission: 2004
Heating, ventilation, air-conditioning and sun jalousie of inteligent administrative bulding, 1.Lina a.s. Bratislava, Slovakia
Hardware: 1x PC (WinXP),
Control stations: 1x FX1N
Mitsubishi Date of commission: 2004
yeast room temperature - Pivovar Zubr, Přerov, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
Modicon Premium
Date of commission: 2004
Dispatcher SW upgrade in stokehold K13 - Doterm servis s.r.o. Meziboří, Czech republic
Hardware: 1x PC (WinXP) + SQL server,
Control stations: 4xRSZ -
Sauter Date of commission: 2004
Pressing device - evaluation, archiv and statistics of production data, CerTec s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Simatic S7-300
Implementation: Ing.František ŽÁK
Date of commission: 2004
Monitoring and control: Polyol and Isocyanat transportation, data archiv, binding to company IS - HP Pelzer Plzeň, Czech republic
Hardware: 1x PC (WinXP),
Control stations: Mitsubishi 2xAnA, 3xFX2N
Implementation: Atria s.r.o.
Date of commission: 2004
Water chemistry processing plant + Neutralization - Plzeňská energetika a.s., Czech republic
Hardware: 2x PC (WinXP),
Control stations: 3x
Simatic S7-300
Date of commission: 2004
Operation monitoring, faulty states, air-conditioning IFE Brno, Czech republic
Hardware: 1x PC (WinXP),
Control stations:
2x
AMiT -Mest100,
AMiT -AMiRiS99
Date of commission: 2004
Monitoring and regulation of energy consumption - Sladovny Soufflet, Kroměříž, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
Simatic S5 155, ET
Date of commission: 2004
Fabrication automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2004
Turbine TG1 50MW - Plzeňská teplárenská a.s., Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
Simatic S5-135U, 1x S7-300
Date of commission: 2004
Dispatching center of the heating plant - FN Plzeň - Plzeňská teplárenská a.s., Czech republic
Hardware: 1x PC (WinXP),
Control stations: Simatic S7-300
Date of commission: 2004
Dispatching system of electric power consumption, Kopřivnice, DURA Automotive Systems, Czech republic
Hardware: 1x PC (WinXP),
Control stations: Simatic S7
Implementation: MICROSYS, spol. s r.o. + MG elektronic
Date of commission: 2004
Fermentor PRAHA, MILCOM a.s., Czech republic
Date of commission: 2004
Heating plan terminal Přerov, Dalkia ČR,a.s., heating plant Přerov, Czech republic
Date of commission: 2004
Control of: Refrigeration system in malt-house - Sladovny Soufflet, Kroměříž, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
Teco TECOmat
Date of commission: 2004
Control and monitoring system, Water power station Gabčíkovo (8000xI/O) - SE a.s. Vodné elektrárne, factory Trenčín, Slovakia
Hardware: 8x PC (WinXP)
Date of commission: 2003 - 2004
Operation monitoring, remote supervision, ČDV Oslavany, DIAMO, s.p., o.z. GEAM Dolní Rožínka, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
AMiT -Mest100 + DIN modules
Date of commission: 2004
Dispatching center of the heating plant, Dalkia a.s., ZTO Ostrava, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 8x PLC
Teco , 8x IPC Octagon, heat meters
Implementation: MICROSYS, spol. s r.o. + Codea
Date of commission: 2004
Monitoring and visualisation: unwoven mat production, Vertex a.s. Litomyšl, Czech republic
Hardware: 2x PC (WinXP),
Control stations: 5x
Simatic S7
Implementation: MICROSYS, spol. s r.o. + Resim
Date of commission: 2004
Control and monitoring system, Water power station Kozmálovce (500xI/O) - SE a.s. Vodné elektrárne, factory Trenčín, Slovakia
Hardware: 1x PC (WinXP)
Date of commission: 2004
Production control and heat distribution in preparation plant Komořany - Mostecká uhelná společnost a.s., Czech republic
Hardware: 1x PC (WinXP) + SQL server,
Control stations:
28x
Landis&Gyr RWP 80 Unigir,
Sauter Date of commission: 2004
Fabrication automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2004
Kneader line 5 - Gumárny Zubří, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 2x
Teco NS-950
Date of commission: 2004
Boiler K8, 100t/h, 4,3MPa, 440 st.C, Power station Kolín a.s., Czech republic
Date of commission: 2004
Waste water treatment plant: Data communication - ČOV Jarcová, Babice, Kelč, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 3x
Allen-Bradley Micrologix 1500
Date of commission: 2004
Oil levels, hydroxide level – Teepack Slavkov, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
Allen-Bradley PLC 5
Date of commission: 2004
City public transport converter station - Prague Bořislavka, Brno Kohoutovice, Czech republic
Hardware: 2x PC (WinXP), Control stations: (Prague) 12x CT05 , CT02, (Brno) 17x CT05, CT02
Date of commission: 2004
Measuring and regulation for object no. 13 - FEROX a.s. Děčín, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
AMiT ADiS
Implementation: LIDRA elektro
Date of commission: 2004
Regulation of energy consumption in factory - FEROX a.s. Děčín, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 3x
AMiT ADiS
Implementation: LIDRA elektro
Date of commission: 2004
Gas stokehold 40 - FEROX a.s. Děčín, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
AMiT ADiS
Implementation: LIDRA elektro
Date of commission: 2004
Control of power engineering and heat regulation - Kabelovna Děčín Podmokly, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
AMiT ADiS
Implementation: LIDRA elektro
Date of commission: 2004
Fluid boiler 8t/h, Colortex Krásná Lípa, Czech republic
Hardware: 1x PC (Win2000),
Control stations: Modicon Premium
Date of commission: 2003
Extension of monitoring of Leadpress technology, Semperflex Optimit a.s.
, Czech republic
Hardware: 2x PC (WinXP),
Control stations: 4x
AMiT ART4000
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2003
Remote control and monitoring in TEZ Medlánky, DPMB a.s., Brno
, Czech republic
Hardware: 1x PC (WinXP),
Control stations: Teco TC605, TC622
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2003
Gas stokehold, Monitoring and control (3xVS, 2xVZT), Koliba Production & Services s.r.o. Bratislava, Slovakia
Hardware: 1x PC (WinXP),
Control stations: 6x FX1N, FX2N
Mitsubishi Date of commission: 2003
Control of: transportation, composition preparation and production - Aliachem a.s., o.z. Fatra, Napajedla, Czech republic
Hardware: 2x PC (Win2000),
Control stations:
4x
Simatic S5 (115, 100),
Modicon Micro
Date of commission: 2003
Vehicle counting in underground garages Siemens, Prague, ELTODO a.s., Czech republic
Hardware: 1x PC (WinXP)
Date of commission: 2003
Control of production and heat distribution Důl ČSA Komořany - Mostecká uhelná společnost a.s., Czech republic
Hardware: 1x PC (WinXP) + SQL server,
Control stations:
32x iRSM - Martia a.s., RSZ, RSK -
Sauter Date of commission: 2003
Operation monitoring, remote supervision, ČDV Běstvina, DIAMO, s.p., o.z. GEAM Dolní Rožínka, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
AMiT -Mest100 + DIN modules
Date of commission: 2003
Control and monitoring system, Water power station Tvrdošín (500xI/O) - SE a.s. Vodné elektrárne, factory Trenčín, Slovakia
Hardware: 1x PC (WinXP)
Date of commission: 2003
Gas stokehold, Monitoring and control, Kabelovna Děčín - Podmokly a.s., Czech republic
Hardware: 2x PC (WinXP),
Control stations: 3x RSZ -
Sauter Date of commission: 2003
Gas stokehold, Monitoring and control, Hamr - United Energy, a.s., divize Energo, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 2x
Modicon Date of commission: 2003
Fabrication automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2003
Control of: el. spool machine (Epsilon, Hubers) - Hanhart, Morkovice, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
Simatic S5 155
Date of commission: 2003
Monitoring of electric power in the real time, OKD, OKK a.s. Ostrava
, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 2x
AMiT Amini
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2003
Monitoring and visualisation: Bulk power substation, remote service by WEB server, error messaging by SNMP protocol - Power dispatching T-Mobile, Czech republic
Implementation: Atria s.r.o.
Date of commission: 2003
Emission monitoring, Spolana Neratovice a.s.
, Czech republic
Hardware: 1x PC (WinXP), Control stations: Datalogger
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring
Date of commission: 2003
Gas stokehold, Monitoring and control, Hotel Zobor Nitra, Slovakia
Hardware: 1x PC (Win2000),
Control stations: 1x FX1N
Mitsubishi Date of commission: 2003
Operation monitoring, data offer to company network, ČPV Vertex Hodonice, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 4x
Simatic C31x-2DP
Date of commission: 2003
Dispather SW upgrade in preparation plant Komořany R1/R2 - Mostecká uhelná společnost a.s., Czech republic
Hardware: 2x PC (WinXP),
Control stations: 13x RSZ -
Sauter Date of commission: 2003
Fabrication automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2003
Waste water treatment plant: Complete control, monitoring and data archive - ČOV Chodská liga (Praves Domažlice), Czech republic
Hardware: 2x PC (WinXP),
Control stations: 2x
SAIA PCD2
Implementation: Atria s.r.o.
Date of commission: 2003
Cool production - West-Czech university - Plzeňská teplárenská a.s., Czech republic
Hardware: 1x PC (WinXP),
Control stations: Simatic S7-300
Date of commission: 2003
ELUIII - Turbine and generator TG8 30MW - Plzeňská energetika, Czech republic
Hardware: 1x PC (WinXP),
Control stations: Simatic S7-400
Date of commission: 2003
Corroborative services Pps ČEPS a.s. - Plzeňská energetika a.s., Czech republic
Hardware: 2x PC (WinXP),
Control stations: Simatic S7-300
Date of commission: 2003
Control of: malt production (Lausman), chlazení Hupmann - Obchodní sladovny, Prostějov, Czech republic
Hardware: 2x PC (Win2000),
Control stations: 1x
Simatic S5 (135, 100)
Date of commission: 2003
Gas stokehold, Monitoring and control, V.I.Trade s.r.o. Nitra, Slovakia
Hardware: 1x PC (Win2000),
Control stations: 1x FX1N
Mitsubishi Date of commission: 2003
Gas stokehold, Monitoring by GSM-SMS Osek, United Energy a.s., Czech republic
Hardware: 1x PC (WinNT),
Control stations: 1x
Modicon Premium
Date of commission: 2003
Fabrication automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2003
Turbine and generator TG 6MW - Ostrovská teplárenská a.s., Czech republic
Hardware: 2x PC (Win2000),
Control stations: Simatic S7-400
Date of commission: 2003
Control and monitoring system, Water power station Bešeňová (400xI/O) - SE a.s. Vodné elektrárne, factory Trenčín, Slovakia
Hardware: 1x PC (WinXP)
Date of commission: 2003
Temperatures monitoring in silo - AGROFERT Silo Rybníky, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
ADAM 4000
Date of commission: 2003
Waste water treatment plant: Operation monitoring, defect monitoring of 5 pumping stations Pasohlávky, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
AMiT ADiS167 + DIN modules
Date of commission: 2003
Control and monitoring of exchange stations by radiomodems, Z-Real Jirkov, Czech republic
Hardware: 1x PC (Win2000), Control stations: 8x Sea MPS
Date of commission: 2003
Terminal of power station, ČEZ,a.s., Power station Dlouhé Stráně, Czech republic
Hardware: 2x PC (WinXP), Control stations: 1x AEG A500
Date of commission: 2003
Terminal of power station, ČEZ,a.s., Power station Dalešice, Czech republic
Hardware: 1x PC (WinXP), Control stations: 1x ZAT Z300
Date of commission: 2003
Monitoring and visualisation: malt-house (Seeger) - Českomoravske sladovny, Zábřeh, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
Simatic S5 115
Date of commission: 2003
Fabrication automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2003
Control of: chemical composition production - Aliachem a.s., o.z. Fatra, Chropyně, Czech republic
Hardware: 1x PC (WinNT4),
Control stations: 1x
Modicon Micro
Date of commission: 2003
Monitoring system of transmission stations and boiler plants, Dispatching Teplice, Czech republic
Hardware: 1x PC (WinXP), Control stations: datové přenosy v síti GSM
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2003
Turbine TG 12MW - Actherm a.s. Chomutov, Czech republic
Hardware: 2x PC (Win2000),
Control stations: Simatic S7-400
Date of commission: 2003
Cover-hall of bituminous compositions Hranice na Moravě, SKANSKA a.s., Czech republic
Hardware: 1x PC (WinXP),2 monitory, OPC server
Control stations: 1x
Schneider-Electric , ATRIUM, TPCX 57353
Date of commission: 2003
Terminal of power station, ČEZ,a.s., Power station Hodonín, Czech republic
Hardware: 1x PC (WinXP), Control stations: 1x průmyslové PC OSC
Date of commission: 2003
Control of electro-stokehold, Teplicka 22, Děčín, Czech republic
Hardware: 1x PC (WinXP), Control stations: 1x iRSM
Date of commission: 2003
Dispatching, THMÚ Ústí nad Labem, Czech republic
Date of commission: 2003
Fabrication automaton - evaluation, archiv and statistics of production data, Mubea s.r.o., Czech republic
Hardware: 1x PC,
Control stations: Moeller PS4
Implementation: Ing.František ŽÁK
Date of commission: 2003
Cool production - Plzeňský Prazdroj a.s. - Plzeňská teplárenská a.s., Czech republic
Hardware: 1x PC (WinXP),
Control stations: Simatic S7-300
Date of commission: 2003
Water power station Písek - river basin monitoring - JČE a.s., Czech republic
Hardware: 1x PC (Win2000),
Control stations: Simatic S5-115U
Date of commission: 2003
Gas stokehold, Monitoring by GSM-SMS Osek, United Energy a.s., Czech republic
Hardware: 1x PC (WinXP), Control stations: 16x GSM modul GSA-03
Date of commission: 2003
Control and monitoring system in TEZ, City public transport converter station Radlas, DPMB a.s., Brna
, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x PLC
Teco (1xTC600, 1xNS950)
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2003
Monitoring and regulation of energy consumption, TOS Varnsdorf, Czech republic
Hardware: 2x PC (WinNT),
Control stations: 1x iRSM,
Simatic S7
Implementation: MICROSYS, spol. s r.o. + Martia, a.s.
Date of commission: 2003
Emission monitoring, incinerator, Katowice, Poland
Hardware: 1x PC (WinXP), Control stations: Datalogger 8800
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring
Date of commission: 2003
Vehicle counting in underground garages Carefour, Prague, ELTODO a.s., Czech republic
Hardware: 1x PC (WinXP)
Date of commission: 2003
Control of: pilot station of plastic pipes - Polymer Institute, Brno, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
Modicon Micro
Date of commission: 2003
Water power station Kružberk - Turbine 3MW, Energo-pro Czech s.r.o., Czech republic
Hardware: 2x PC (Win2000),
Control stations: Simatic S7-300
Date of commission: 2003
Control and monitoring system: Water power station Mikšová (1500xI/O) - SE a.s. Vodné elektrárne, factory Trenčín, Slovakia
Hardware: 3x PC (WinXP), Control stations: 10x Octagon/ELIS (2500xI/O)
Date of commission: 2003
Control of: malt production (Seeger, Braumat) - Sladovny Soufflet, Kroměříž, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
Simatic S5 155, ET
Date of commission: 2003
City public transport converter station, Prague: Barrandov+Hlubočepy, Plzeň: Zátiší, Brno: Radlas+Střed, Czech republic
Hardware: 1x PC (WinXP), Control stations: CT05, CT02
Date of commission: 2003
4 heating stations, 8 grade school Louny, Czech republic
Hardware: 1x PC (WinXP),
Control stations: 1x
AMiT ADIS
Implementation: Lidra elektro
Date of commission: 2003
Pressure hose production, Monitoring and control, Semperflex a.s., Odry
, Czech republic
Hardware: 2x PC (Win9x,NT,SQL),
Control stations: AMiT 54xART4000, 2xDOKOPO, 3x
AMiT ART4000
Implementation: MICROSYS, spol. s r.o. + AMiT
Date of commission: 1998, 2001, 2002
Control system: Water chemistry processing plant, Plzeňská teplárenská, a.s., Czech republic
Hardware: 2x PC (Win2000 Professional),
Control stations: 13x PLC
Schneider-Electric Nano, Micro, Premium
Date of commission: 2002
Regulation of gas emitters and etaheads TEZ Pisárky, DPMB a.s., Brna
, Czech republic
Hardware: 1x PC (Win2000), Control stations: Etahlavice + plynové zářiče
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2002
Monitoring and control: Chicken hatch, Xaverov, a.s. branch Habry, Czech republic
Hardware: 1x PC (Win98, 4xCOM),
Control stations:
2x
AMiT ,
10x
Omron Implementation: Antonín Hradil
Date of commission: 2002
Emission monitoring, incinerator, Ústí nad Labem, Spolchemie, Czech republic
Hardware: 1x PC (Win98), Control stations: Datalogger 8816
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring
Date of commission: 2002
Remote control in TEZ Medlánky, I.phase, DPMB a.s., Brna
, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 6x PLC
Teco (5x TC600, 1x NS950)
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2002
Turbine TG2, Power station NH, a.s. Ostrava, Czech republic
Hardware: 1x PC (Win2000)+TouchScreen,
Control stations: SAIA PCD4
Implementation: NH, a.s. Ostrava, Automatizace-455
Date of commission: 2002
Exchange station, elementary school Jirkov, Monitoring and control, Czech republic
Hardware: 1x PC (Win98), Control stations: 1x Sea MPS
Date of commission: 2002
Dust exhausting of arc furnace No.3, Siderurgica, Hunedoara, Romania
Hardware: 1x PC (Win98),
Control stations: 1x
Simatic S7-300
Date of commission: 2002
Cooling engine room, Monitoring and control, Interpharma Prague, Czech republic
Hardware: 1x PC (Win98),
Control stations: 1x
Modicon Premium
Date of commission: 2002
Measuring system of pumps testing, Sigma Group a.s., Lutín, Czech republic
Hardware: 1x PC (Win9x), Control stations: Měřicí ústředna HP34970
Implementation: MICROSYS, spol. s r.o. + AMES s.r.o.
Date of commission: 2002
Control system: Turbine 70 MW, Plzeňská teplárenská, a.s., Czech republic
Hardware: 2x PC (Win2000 Pro),
Control stations: Simatic S5-135U
Date of commission: 2002
Register program of boat weigh - HOLCIM, Pískovna Dobříň, Czech republic
Hardware: 1x PC (Win98), Control stations: 1x Vaha Boekels
Date of commission: 2002
Monitoring and regulation of energy consumption, UNION Lesní Brána, Teplice-Dubí, Czech republic
Hardware: 1x PC (WinNT),
Control stations: iRSM,
Simatic S7
Implementation: MICROSYS, spol. s r.o. + Martia a.s.
Date of commission: 2002
Control system: Turbine 12 MW, ACTHERM, s.r.o. factory Chomutov, Czech republic
Hardware: 2x PC (Win2000 Pro),
Control stations: Simatic S7-400
Date of commission: 2002
Central power dispatching center, Sokolov, RSM CHEMACRYL, a.s.
, Czech republic
Hardware: 12x PC (WinNT, Win9x),
Control stations: Průmyslové PC + PLC
Modicon Implementation: MICROSYS, spol. s r.o.
Date of commission: 2002
Exchange stations, Monitoring and control, DPMB a.s., Brno
, Czech republic
Hardware: 2x PC (Win2000),
Control stations: Teco TR300, TC600
Implementation: MICROSYS, spol. s r.o. + Sting Energo
Date of commission: 1999 - 2001
Electricity consumption and production dispatching system - ZSNP, a.s., Závod Energetik, Slovakia
Hardware: 1x PC (WinXP),
Control stations: 1x
ADAM 6051
Implementation: ZSNP, a.s.
Date of commission: 2001
Silos temperature monitoring - ZENZA Rakšice, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
ADAM 5000
Date of commission: 2001
Control system: shelf interpolator, Karosa Vysoké Mýto, Czech republic
Hardware: 1x PC (Win9x),
Control stations: Mitsubishi Implementation: MICROSYS, spol. s r.o.
Date of commission: 2001
Monitoring and control: VVTL gas control, Bylany, SČP a.s., Czech republic
Hardware: 1x PC (WinNT), Control stations: 2x Sea MPS
Date of commission: 2001
Diary Klatovy, Czech republic
Hardware: 1x PC (Win9x),
Control stations: AMiT ART 400
Implementation: RTP, s.r.o.
Date of commission: 2001
Hydrotalcit production, Chemical processing plant, Dolní Rožínka, Czech republic
Hardware: 1x PC (Win9x),
Control stations: AMiT ADiS + DIOCAN
Implementation: RTP, s.r.o.
Date of commission: 2001
HV and LV circuit breakers, Monitoring and control, MAFRA Prague, Czech republic
Hardware: 1x PC (Win9x), Control stations: ABB SCU REF542
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2001
Monitoring system of vibrations and bearings on digger and DPD, SD Bílina, Czech republic
Hardware: 1x PC (Win9x),
Control stations: 8x ZAT,
Simatic Date of commission: 1997 - 2001
Diagnostic system of vibrations and bearings on heating plant 700, Chemopetrol, Litvínov, Czech republic
Hardware: 1x PC (Win98),
Control stations: Honeywell + MPMCM2
Date of commission: 2000 - 2001
Register system of weigh - Bajkalskie mineraly, Russia
Hardware: 1x PC (WinNT),
Control stations: 1x
Simatic S7-200
Date of commission: 2001
Weigh to special oven - Ferex ŽSO, Liberec, Czech republic
Hardware: 1x PC (Win2000),
Control stations: 1x
Simatic S7-300
Date of commission: 2001
Monitoring of cooling engine room, Unilever s.r.o. Nelahozeves, Czech republic
Hardware: 1x PC (WinNT),
Control stations: 1x
Modicon Premium
Date of commission: 2001
Diagnostic system of vibrations, Česká rafinérská a.s., Kralupy n/Vltavou, Czech republic
Hardware: 2x PC (Win98), Control stations: SKF M800 + Prism/Microlog
Date of commission: 2001
Control of exchange stations, OEZ Letohrad s.r.o., Czech republic
Hardware: 1x PC (Win9x),
Control stations: AMiT AMiRiS99, AMAP99, APT130
Implementation: Regprofi s.r.o., Hradec Králové, AMiT s.r.o.
Date of commission: 2001
Heating and air conditioning of facilities, Comfort association, Plzeň, Czech republic
Hardware: 1x PC (Win9x),
Control stations: AMiT 3xAMiRiS, 3xAMiRiS99, AMAP98
Implementation: Comfort sdružení Plzeň, AMiT s.r.o.
Date of commission: 2001
Measuring and regulation of quarter-hour consumption, FEROX a.s., Děčín, Czech republic
Hardware: 1x PC (Win9x),
Control stations: AMiT 3xADiS, AMiRiS
Implementation: ERVIS s.r.o., Ústí n. L.
Date of commission: 2001
Emission monitoring, heating plant Z.E.C. Inowroclaw, Poland
Hardware: 1x PC (WinNT), Control stations: Datalogger 8816
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring
Date of commission: 2001
Control system: Turbine 6,8 MW, CINERGETIKA Ústí nad Labem, a.s., Czech republic
Hardware: 1x PC (Win2000),
Control stations: Simatic S5-135U
Date of commission: 2000
Regulation of steam boiler plant BOZP, Meat processing Polička, Czech republic
Hardware: 1x PC (Win9x),
Control stations: AMiT ADiS, APT130
Implementation: MaRMONT s.r.o., Chotěboř
Date of commission: 2000
Waste water treatment plant, Benátecká Vrutice, Czech republic
Hardware: 1x PC (Win9x),
Control stations: AMiT 3xADiS, AMiRiS
Implementation: UNITECH Štěfan Macejka
Date of commission: 2000
Control system: Water chemistry processing plant, Plzeňská teplárenská, a.s., Czech republic
Hardware: 1x PC (Win2000),
Control stations: 2x
Simatic S7-300
Date of commission: 2000
Processing line control of rubber pre-mixtures, Adds TYRE Comp., Adis Abeba, Ethiopie, Ethiopia
Hardware: 1x PC (Win98),
Control stations: 2x
Simatic S7-400
Implementation: A.S.P.R. s.r.o.
Date of commission: 2000
Measuring of purity of expanded CO2, Emission monitoring H2S - Chemopetrol, a.s., Czech republic
Hardware: 1x PC (WinNT),
Control stations: Datalogger 8816,
ADAM 4017
Implementation: MICROSYS, spol. s r.o. + ECM ECO Monitoring
Date of commission: 2000
Control system: Water chemistry processing plant, Plzeňská energetika, a.s., Czech republic
Hardware: 1x PC (Win2000),
Control stations: 2x
Simatic S7-300
Date of commission: 2000
Turbine and generator TG 8MW, Setuza a.s. Ústí/L, a.s., Czech republic
Hardware: 1x PC (Win2000),
Control stations: Simatic S5-135U
Date of commission: 2000
Grading-up of processing line of steel products, ZETOR a.s. Brno, Czech republic
Hardware: 1x PC (Win9x),
Control stations: SAIA Implementation: MICROSYS, spol. s r.o. + Elektroteplo Kolín
Date of commission: 2000
Control and evaluation of material deformation tests, Polymer Institute Brno, Czech republic
Hardware: 1x PC (Win98), Control stations: AMAP99, APT130
Implementation: XiNTECO Kroměříž
Date of commission: 2000
Control of switching station 110/22kV, Energoaqua a.s., Rožnov pod Radhoštem, Czech republic
Hardware: 1x PC (Win98),
Control stations: 3x
Simatic S7-300
Implementation: A.S.P.R. s.r.o.
Date of commission: 2000
Diagnostic system of vibrations and bearings in Energotrans, Energotrans, Prague, Czech republic
Hardware: 2x PC (Win98), Control stations: SKF systém Multilog/Prism
Date of commission: 2000
Monitoring of air consumption, PLEAS Havlíčkův Brod, Czech republic
Hardware: 1x PC (Win9x), Control stations: NEWPORT
Implementation: MICROSYS, spol. s r.o.
Date of commission: 2000
Diagnostic system of bearings in paintshop, Škoda auto, a.s. Mladá Boleslav, Czech republic
Hardware: 1x PC (Win98), Control stations: SKF systém Multilog/Prism
Date of commission: 1998 - 2000
Diagnostic system of vibrations and bearings, ČEZ EPO Trutnov, Czech republic
Hardware: 1x PC (Win98), Control stations: SKF systém Multilog/Prism
Date of commission: 2000
Dispatching system of production and transport dispatching center, OKD a.s., Důl ČSM o.z., Czech republic
Hardware: 6x PC (Win98), Control stations: 1x MTA 21.30, 1xPRES
Implementation: MTA Ostrava s.r.o.
Date of commission: 2000
Control and regulation of quarter-hour consumption, VPO Protivanov, Czech republic
Hardware: 1x PC (Win9x),
Control stations: AMiT AMiRiS99
Implementation: SKS s.r.o.
Date of commission: 2000
Modernization of gunite production, Lime-kiln Čebín, Czech republic
Hardware: 1x PC (WinNT),
Control stations: Simatic S5
Date of commission: 2000
Air-transport of flour, Baker Prostějov, Czech republic
Hardware: 1x PC (Win98)
Implementation: MICROCOMP Milevsko
Date of commission: 2000
Checking system and control of Water power station Vranov n/Dyjí TG1 Jihomoravská energetika, Czech republic
Hardware: 1x PC (WinNT),
Control stations: SAIA PCD4
Implementation: BOHEMIA INSTRUMENTS
Date of commission: 2000
Diagnostic monitoring system of turbine generator unit 200 MW, Nuclear power station Mochovce, Slovakia
Hardware: 1x PC (WinNT),
Control stations: 3x
SAIA PCD4, 12xDIAMO L
Implementation: BOHEMIA INSTRUMENTS
Date of commission: 2000
Dispatching center of power in housing enterprise Štúrovo (15MW), Slovakia
Hardware: 1x PC (Win9x),
Control stations: 14x
Simatic S7-216
Implementation: Delta Plus, Siemens Bratislava
Date of commission: 2000
© Microsys, spol. s r.o., e-mail: microsys@microsys.cz